Hot Search: atomrobot 机器人 D3P D3PM D4 D5 S6
go back
Pharma Industry

Vials of penicillin

After the filling process, the sealed products are sent to the back packaging workshop by the conveyor belt and stored at the equidistant material handling mechanism At the same time, the palletizer completes the production of the supporting box, and transports it to the bottom of the palletizer for accurate positioning. Then, the parallel robot grabs 10 vials for loading. After the operation, the intermediate transfer link is transferred to the chain plate slot of the palletizer, and the palletizer completes the packaging.

Economic benefits

  • Production capacity

    42000Bottles/hour
  • Manpower

    2
  • Productivity improvement rate

    40%
  • Payback period

    18Months

Production-line process

  • 01

    The vials from the front outlet are transported to the material handling system through the conveyor line.

  • 02

    After the support of the supporting mechanism is completed, it is placed by the conveyor belt robot on the conveyor line for accurate positioning.

  • 03

    The robot grabs 2 * 5 vials, loads them into the positioning tray after grabbing, and then grabs them in the next cycle.