Economic benefits
-
Production capacity
42000Bottles/hour -
Manpower
2 -
Productivity improvement rate
40% -
Payback period
18Months
Production-line process
-
01
The vials from the front outlet are transported to the material handling system through the conveyor line.
-
02
After the support of the supporting mechanism is completed, it is placed by the conveyor belt robot on the conveyor line for accurate positioning.
-
03
The robot grabs 2 * 5 vials, loads them into the positioning tray after grabbing, and then grabs them in the next cycle.